Showing posts with label plumbing. Show all posts
Showing posts with label plumbing. Show all posts

Monday, June 15, 2009

Cleveland Craigslist alert - ribcage shower!

ribcage

I found this marble enclosed ribcage shower on the Cleveand craigslist. They're looking for offers. You know it's exactly what you want for your house!

Monday, June 1, 2009

Painting!

Before:
Stairs

After:
green stairway w/view of mud room

The front hallway is finally painted. I began this project in, um, November. These two photos showing the completed painting courtesy of the always lovely Audrey.

green foyer w/view of dining room and air lock

Stripping the wallpaper glue was a pain in the neck. We managed to complete the removal of the glue in the second floor hallway and about halfway down the stairs before I got completely discouraged. I recalled a suggestion that we could put a coat of Killz over the glue, a skimcoat, and another coat of Killz. What I failed to remember was that this would only work if the glue has relatively little texture.

Skimcoating took forever, as did sanding it. The entry hallway, however, is finally done. Last night, I painted the second floor hallway with the roller. I also did some brushwork - enough to finish up the paint I had in the tray. Tonight, I'll finish the second floor hallway and hopefully clean up this mess, too. Ugh.

In unrelated news, the trap on the paint sink started leaking last night. From the looks of the corrosion on it, this has been an issue for quite some time. Ugh. We'll put a bucket under it for now and add it to the list.

Monday, May 4, 2009

Plumbing goodies!

When I talked to my plumber/general contractor today, he said that he had some plumbing stuff from another job in Shaker Heights that he thought I might be interested in. They had given him permission to do with the old parts as he saw fit. He said that there were at least some good parts there, and that whatever I didn't want, I should just discard. This is what was waiting for me when I got home:

What a lovely surprise!

It's almost everything one might need to plumb a 1920s or perhaps 1930s bathroom sink. The parts all appear to be Standard brand.

1920s Standard shut-off valve with porcelain escutcheon

There are two shut-off valves, both stamped "Standard", with matching porcelain escutcheons. The valves still seem to operate properly.

1920s Standard faucet with porcelain drain plug

There's a nice faucet.

Further, there are three faucet valves, of which two should be workable, five handles, two porcelain escutcheons for the handles (one of which is marked "Standard" on the outside, and this:

Another bit of plumbing, Standard brand.

I'm not sure what it is. I'll have to ask the plumber the next time I see him.

This would make for a really nice setup in the bathroom up on the third floor, to match the Standard sink and tub already present, and the Standard toilet waiting to be rebuilt. The finish shows some pitting, which seems to be exclusively in the plating, so they could all be replated if I really wanted to. My dilemma is this: they look enough that I'd install them if I had the skills to do so, but not so good that I'm willing to pay someone else for all the labor involved to install them. I guess this means that they go into the plumbing parts drawer, either for eventual use in the third floor bathroom or for eventual regifting.

I had told him that I'd be interested in old parts like this - it'll be interesting to see what else he comes up with. I know that it will eventually bring him more work, in rebuilding and installing them.

The plumber/general contractor also says that he'll be able to deal with the dead trees with the lift that he'll be using for the roof, and that it will cost less than what the landscaping guy would have charged.

Finally, I tilled the garden plot. The tiller was quite a beast. I rented the small tiller - I can't imagine how impossible it might be to wrestle the large tiller around. The garden area is mostly well tilled, with the exception of the area between the turtle patch and the tree, which caused much trouble. The sheer quantity of large tree roots was problematic to say the least. It's not tilled as deep as the rest of the garden, but it will have to do for now, until I can cut every single tree root out.

Friday, May 1, 2009

Researching our Trenton Potteries Si-Wel-Clo toilet

I've been using Google Books to do some research and try to figure out exactly when the toilet, a Si-Wel-Clo by Trenton Potteries, in my non-master bath was made. I haven't been able to find anything exactly like it in the literature I've seen for their products in 1925 or 1926, when our house was built. Google Books now allows you to cut and paste from books that are in the public domain (and probably some others, too).

The closest match I've been able to find is the one below, in The Architectural Review, from 1919. The tank, however, looks closer in shape to the one shown in the American Review of Reviews from 1915. While the shape of the tank is right on, the water supply for our tank is at the top, not the bottom.

Trenton Potteries published a hardbound catalog of their complete collection, under the title of The Blue Book of Plumbing. The 1921 edition, Catalogue R, came in at about 350 pages, the 1927 edition, Catalogue T, a mere 200 or so. As for Catalogue S, WorldCat lists no copies, so I cannot be sure, but I expect it would be somewhere between the two. These books, like many trade catalogues of the vintage, are extremely rare. WorldCat lists but five copies of Catalogue R and four of Catalogue T worldwide. There are no copies of catalogues O through Q, nor are there any listed before the letter N. As for their locations, there are two libraries that have all three of the catalogued catalogs - Rutgers University and the US Patent and Trademark Office. It'd be great to sit down with copies of these catalogs so that I could compare and contrast them.

[Note: this post brings to my attention that I really need to adjust the template I'm using to more readily show wider images.]

Text not available
Architectural record By American Institute of Architects - 1912

Text not available
The World's work a history of our time By Walter Hines Page, Arthur Wilson Page - 1914

Text not available
The American Magazine - 1915

Text not available
The American Review of Reviews By Shaw, Albert, 1857-1947 - 1915

Text not available
McClure's Magazine ... - 1915

Text not available
The Architectural Review - 1919

Text not available
The National geographic magazine By Henry Gannett, National Geographic Society (U.S.), Gilbert Hovey Grosvenor, Melville Bell Grosvenor, John Hyde, John Oliver LaGorce - 1922

Monday, April 20, 2009

And a photo update, thanks to the lovely wife

New radiator valves
New radiator shut-off valves

new radiater bleed valve
One of the new bleed valves

new pipes for the fountain
The new plumbing for the faucet outside our garage and the fountain. Yes. Fountain. I can't believe it either.

Finally, an update!

There's been a fair amount of work being done on our house recently, unfortunately, most of it is the sort of stuff that doesn't lend itself terribly well to photography.

We had the previously-discussed plumber provide us with an estimate regarding items on the city point-of-sale inspection as well as a considerable amount of work with regard to our radiators. Many of the radiators, you see, have valves that either don't open, don't close, or are leaking. Further, many of the bleeder valves won't bleed. A couple of the radiators, in the attic, didn't have shut-off valves at all.

His estimate seemed very reasonable, so we decided to go ahead with the work. When I did a final walkthrough with the plumber before he ordered the parts and began the work, we found a few more valves that needed to be fixed, as well as several bleeders that didn't bleed. He said that he could get all of this done, at the price he had estimated originally.

There was some additional work required - the baseboard radiators in the library had to be replaced, as they didn't have a hot-water return line, and had become clogged. This was done at reasonable material cost.

The entire time, the plumber kept us well informed of his progress, consulting us at each step along the way where decisions of aesthetics might be involved. He is quite comfortable dealing with the issues involved with older plumbing systems.

As this work was nearing completion, we had talked about the repairs that I hope to have done on the roof. I thought that the plumber might know someone who could do the repairs on the roof at more reasonable rates, given that his rates were lower than what I might have expected. He talked to a roofer with considerable experience with slate and came up with an estimate considerably lower than the other estimate I received. The plumber would act as the general contractor and would be doing some of the basic work on the job. His estimate was such that it seems we'll be able to get almost everything done this year!

I came up with a diagram of all of the areas of damage that I saw on the roof and discussed this with the plumber. On Sunday, we went over everything again, including my specifications, and I wrote him a check for the cost of materials. He's begun assembling materials and tools in the garage and will begin work on the roof on Wednesday, if weather permits.

I'll be sure to keep posting as the work progresses.

Thursday, March 19, 2009

The Perfect Faucet, Part II

perfect faucet

Oh no! It's the perfect bathroom faucet, on a sink! It's not so terribly far away, either.

This is almost exactly the same faucet that I wrote about a little while ago. It's nice to know that there are more of them out there.

Friday, March 13, 2009

The perfect bathroom sink faucet set

My idea of the perfect faucet

My idea of the perfect faucet

I never liked the faucets on most of the sinks from 1920s houses, not because the hot and cold were separate, but because they were so close to the edge of the sink. I recently learned that mixer faucets were available in the 1920s, albeit only in higher-end installations. I've been looking for various plumbing bits, trying to piece together the pieces of hardware to make the bathrooms complete. Most of this will have to wait for a while, given the cost of most of these things, but it's nice to know what's out there so that one can plan.

I came across the gem above on eBay recently - it sold for about $125. It's the only porcelain mixer faucet of that era that I've seen - all the rest are metal. It would have been perfect, oh yes. Even with the cost of rebuilding the valves, it would have been worth it. Whether I could convince A of that is another matter. My eyes remain open for the next one to hit the market.

This is all a diversion, mind you, to keep me from ranting about my plumber and general contractor. I've a phone call to make tomorrow morning. Argh.

Thursday, March 12, 2009

Contractor woes, an update

I talked to the plumber today before leaving for work. He explained that he was unable to obtain a straight vertical pipe (I forget the technical term) that goes between the tank and the bowl that is long enough. He said that he'll be fabricating an extension, so that it will sit at the right height.

He further stated that he had attached it to the wall so that he could figure out exactly how high it needed to go. When I pointed out to him that this was one more unnecessary hole in the wall, he said that it would be covered by the tank and that he would caulk it in. I countered that this was an unblemished tile that could have been used for a repair elsewhere in the room, and that this was a hole in the wall that didn't need to be there.

I don't know what to ask for at this point. While there may be manufacturers out there that make white tile that the same shape and has a flat glaze, matching the color will be close to impossible. I don't think it's reasonable to ask him to cover the cost of a custom color match for one tile - that would be excessive.

What would you do? What would you ask for?

Wednesday, March 11, 2009

Contractor woes, part II

Toilet, non-master bathroom

Earlier, I mentioned some problems with my general contractor and the sub he has fixing our toilet. Those issues were not issues at all, but the result of a miscommunication. There was, however, one major problem.

Look at the previous entry. Now look at the picture at the top of this entry. Notice something different? Yup, they failed to install the ceramic tubes between the bowl and the tank. An error corrected easily enough. Look harder. Notice anything else?

Old and new holes

Perhaps this picture will help illustrate things more clearly. See the row of holes in the wall? Those are where the bolts from the tank used to go. See the shiny new hardware going through the tank? Notice that the tank is now bolted into the wall a couple inches lower than it was previously? I'm not happy. There's no way that the lid could sit on the tank like that. How could someone get that far without seeing that he had screwed up?

So I called up the general contractor, left a message, and waited for his return call. He seemed to be familiar with the situation, though he didn't say anything to suggest knowledge of it prior to our phone call. He acknowledged that the tube between the tank and the bowl was too short, and that a longer one would have to be obtained. He said that he would be there tomorrow to ensure that the work was completed properly.

I've little confidence that he'll actually show up.

Right now, there isn't much I can do. The last time I paid him was five weeks ago, for work that was completed in a satisfactory manner. I don't have any problem with the work that he's completed thus far - the rates that he's charged have been reasonable and the quality of the work has been to my expectations. This business, however, of not showing up when he's said he'll show up - and not calling to let me know that he won't be here - it's really getting to me. He's been placing all the blame on the sub that he hired for the plumbing - um, isn't the reason why I'm dealing with a general contractor so that I don't have to deal with the problems of the subcontractors? Isn't that his job? The manner that he spoke about the subs problems was inexcusable. How do the sub's problems change the need for the general contractor to call if he can't keep an appointment?

I'd fire him right now, except that I will have this problem resolved.

I'm looking for a plumber in the Cleveland area who is comfortable dealing with old plumbing and fixtures. I'll pay fairly for good work. If anyone has names that they'd like me to consider, please send them my way.

Contractor woes

Siwelclo, by Trenton Potteries

This morning, a text message showed up in my inbox from A, stating that the plumbers had permanently affixed this toilet to the floor.

This was the toilet that had leaked and caused so much other damage previously. We've been waiting five weeks for them to get parts and get over here, which has become more and more frustrating. Our frustration is not so much due to the delay as the manner in which our general contractor keeps telling us that he will be here at a certain time and then not showing up. This might be ok if he called and said that he wasn't going to be able to be there, but to just not show up is unacceptable.

A says that they permanently affixed it to the floor because there was no way to properly secure it otherwise without damaging the tile. What are we supposed to do now if something happens and the toilet has to be repaired? The fixtures in our bathrooms are almost entirely original, and I really really like it that way. Another toilet bowl for this toilet would be $500 or so from a retailer dealing in such things. Is this a compromise that I'm just supposed to make to deal with these issues?

I'll be investigating this mess when I get home, and probably having some choice words with the plumber tomorrow.

UPDATE

The toilet bowl was not affixed to the floor - there had been a miscommunication. Rather, the new flange is permanently affixed to the floor, which is perfectly acceptable. There are, however, major issues, which I will detail later, and which I have been told will be addressed tomorrow.

Thursday, March 5, 2009

Cobalt blue toilet and sink on eBay!

I was browsing on eBay when I came across this very blue 1920s toilet and sink. They seem too blue to be believable, but I want to believe, oh, I want to believe. And for a mere $100! Surely you need them!

Tuesday, February 24, 2009

Need a book on rehab plumbing and electrical

There are many fine books out there on plumbing and electrical work. There are even some good ones on how to do things properly when you remodel - I'm especially fond of the ones from the Taunton Press. However, there is a third type of book that I really hope exists.

I'm looking for a book (or any other source) that illustrates how to take the plumbing that is already there and make it work properly. I want to know how to fix the worst of my plumbing and electrical without redoing it all. I want pictures that show electrical situations like mine and how they are resolved.

Any ideas?`

The builders of the house did WHAT?

Cracked joist (opposite side)

I muttered previously about the unnecessarily massive notch that the plumbers cut into the joists in the library when they ran new bathroom plumbing in the 1960s. I wanted to figure out why they would do this. It seems that the original plumbers had a less than brilliant idea - they ran the plumbing through the concrete that was used as a bed for the tile in the bathroom. Doh! While this may have made for a more solid structure initially, it didn't take into account that the plumbing would eventually fail and have to be replaced.

Friday, February 20, 2009

Perhaps I was a little too smug...

Cracked joist

I've gone on and on about how incredibly not messed up our house is. I've talked about how I couldn't find one bit of dodgy electrical work, etc., etc.

Note the massive crack in the joist in the center of the picture. This joist happens to run right underneath the center of the bathtub and the shower pan in the master bathroom. Further, note that there appears to be a chunk missing from the bottom of the joist. At the point that the electrical passes through the joist, it is about 1.5 inches below the next joist over.

I don't have any way to know whether the joist was cracked or if just the piece was missing when the ceiling was replaced and the plumbing work was done, in 1967. Either way, I place the blame on whoever did the work. When presented with a joist that was so compromised, it should have been addressed.

Cracked joist (opposite side)

They also saw fit to notch the joists enough to properly insulate the pipes, which resulted in two of them cracking. Further, they stuffed enough fiberglass around the knob and tube wiring to start a good fire, and closed up an electrical box in there as well.

Of course, I shouldn't be surprised by the quality of the plumbing installed by the same individuals. There is corrosion around every single fitting - and in some places where there aren't even any fittings. Not good.

As if this all wasn't bad enough, the framing under the shower pan, which was redone more recently, doesn't look too hot either.



I'd love nothing more than to replace all of this plumbing while we have the ceiling open. However, that simply isn't in the budget right now. What we'll probably end up doing is addressing the structural issues before the ceiling goes back up, use greenboard for the ceiling, and deal with the plumbing when we can.

What was where in the shower?

Shower

I'm trying to determine the original plumbing configuration for my shower. I don't plan to do anything about it in the immediate future, mind you, it's just that it doesn't quite make sense and perhaps a few more pairs of eyes can help.

Shower knobs

The shower head and needles are almost certainly in their original location. I feel it is reasonable (though don't have any evidence one way or the other) to assume that the knob for the needles is also in its original location. I strongly suspect (though again, without any evidence one way or the other) that the two escutcheons at the bottom were originally for the hot and cold water. The tile behind them appears to have been removed, presumably when the mixer was installed, so I cannot be absolutely sure of it.

The real question is as to what the remaining knob, the one directly above the mixer, would have been used for. Presently, it is fixed in place - I assume that the knob was placed there to cover the valve stem.

My only guess is that the remaining knob was to turn the shower on and off, so that one might be sprayed by the "needles" alone. I presume that it would have been labeled "shower".

The one remaining original handle was made by Republic, so I presume that the remaining handles would have also been made by them. DEA Bath Machineries has a Republic showerhead in stock, for a mere $145. That's not in the budget right now, but it's not utterly insane, either.

I welcome other ideas as to possible plumbing configurations or insights regarding the set up of this shower.

Thursday, February 19, 2009

Library ceiling demolition

Demolition for the library ceiling is proving to be more of a challenge than expected. This house was built like a tank. While I'm sure that the celing in this room has been replaced, I'm unclear as to the age of the crown moulding. It is so firmly attached to the plaster, using metal lathe, that I suspect they were installed at the same time, however, I cannot be sure.

The problem with demolition is that the plaster moulding appears to have been made in place. It has a backing of metal lathe, which is held into the wall with nails and mortar. The plaster is built up on top of that.

The plaster is just about bulletproof. With a hammer and chisel, I'm able to make slow progress. If the moulding was in any better condition, I'd feel guilty about tearing it out. As it is, it's merely an annoyance that slows me down.

I've uncovered all manner of surprises. The plumbing for the two second floor bathrooms was redone at some point in the past, in copper. Most of solder joints are suspect - they all show at least some corrosion.

There is a joist under the tub in the master bath, that cracked and deflected downward about 1.5 inches. When the ceiling was torn out, they just chiseled a chunk off the bottom of it, rather than supporting it and sistering it up. Ack.

The shower pan in the master bath was replaced by the previous owner. Their choice of tile left quite a bit to be desired. The framing under the pan clearly suffered from the leaking water. Further, a significant part of the shower pan that seems to be supported by a piece of plywood held in place by some randomly placed drywall screws. At the very least, I'll be adding some support there.

Monday, February 16, 2009

Libraries open up a world of surprises

Library ceiling

Do you see what I see?

Yes! That's fiberglass insulation! But what is fiberglass insulation doing under this untouched plaster? Right - not so untouched.

Library ceiling

I must credit the quality of the plaster work on whoever did the work here - it is really impressive. The ceiling is made of a material that appears to be similar to drywall, only a bit more dense and only about 16" wide. It is about 5/8" thick and runs perpendicular to the joists. The seams on the joists are held together by metal lathe and a layer of plaster about 1/2" thick. If not for the water, this repair work would have been bulletproof. The metal lathe gripped the crown moulding at the edges - there's no way I could have gotten it apart.

Guardian Fiberglass

Perhaps this fiberglass will help date the work.

I'm really really glad that I tore out the plaster. There was some mold where the water had been sitting. There was also evidence of some sort of small rodent's nest in the fiberglass.

Slightly crispy looking knob and tube

Another concern I will be addressing is this bit of knob and tube - it seems that the junction overheated a bit, probably due to being covered with fiberglass.

Library ceiling

Further, this joist has a disconcerting crack in it - I'll probably be sistering it up before everything goes back together.

Library ceiling

I'm not going to ask about the various loose pieces of wood here.

Insulation in the library ceiling

Finally, while insulating hot water pipes is important, I'm not sure that notching joists to this extent is the proper course of action in order to accommodate the insulation.

The Voice of Reason

This Saturday, my mom and stepfather came over for a late lunch, and to consult on various house projects, present and future. My stepfather has sold bulding materials for the past 30 years, so while he may not have the experience of someone who has actually done some of this stuff, he has a pretty good idea about what works and what doesn't. He has the insight to figure out how to make things work on a budget. Finally, he tends to be more interested in the solutions that perform the best rather than those that a historic preservationist might choose. This means that I'll hear ideas from him that I wouldn't have otherwise considered, and that I may not be willing to adopt, but that at least will allow me to make a more informed decision.

Water damage to the library ceiling

As I mentioned earlier, a plumbing leak caused this set of lovely bulges and stains on the library ceiling. After I heard my contractor's estimate, I decided that I would do the repair myself. The question became how to rip out the ceiling without damaging the plaster crown moulding.

My stepfather pointed out that the crown moulding was really not in very good shape. On one wall, a large area was repaired quite clumsily. In other places, the moulding appears to be detatching from its substrate.

Library

Further, as can be seen here, access to the moulding is made difficult by the trim that goes over the blinds and drapes. This trim is constructed in such a way that it would be quite difficult to remove without causing some damage. Conversely, with it in place, it would be very difficult to cut out the existing plaster without damaging the crown moulding.

This all comes down to the question of just how much of a historic preservationist nutjob I am (as well as how much of a preservationist nutjob my wife can stand to live with). Given the right house, I could put an insane amount of labor into historic preservation - for instance, for any sort of American farmhouse from the first third of the 18th century, I'd do almost anything. I'd be willing to strip layer upon layer of paint off of woodwork to get down to the original paint or go to ridiculous lengths to repair parts others said were unrepairable.

This, however, is not such a house. It is a very good, but not great example of the sort of house built in this city in the 1920s. While the bathrooms are mostly original, 2 of the toilets have been replaced as well as all of the faucets. There has been some rather clumsy tile work done here and there as plumbing was upgraded. Most significantly, all of the kitchen cabinets were replaced in the 1950s.

Over the course of the work I've done on this house, I've come to the conclusion that, at the time we moved in, all of the walls were the original plaster. The ceiling in many areas has been covered with spikey plaster, but under that, to the best of my ability to tell, the plaster is original. I tore out the wall on one side of the stairs down to the basement and the ceiling in the shower, both to fix city code violations. When I tore out the wall on the basement stairs, I didn't realize that it was original - I thought, from the way it was bowed and shaped that it must have been someone's clumsy attempt at a repair. The material seemed like drywall, so I assumed a later repair. Only when I began tearing open the ceiling in the shower, which was clearly original, did I realize that all the walls in the house were comprised of plaster on fiberboard.

Do I regret tearing out these walls? A little bit. Would I have found ways to avoid doing so if I had it to do again? Maybe. The light fixture at the time in the shower scared me - a plain bit of porcelain with a bare bulb. If I had known at the time that I started to tear out the ceiling how relatively water-resistant it was, in comparison to most similar fixtures, I might have tried to argue with city hall in favor of ignoring this code violation. Again, if I had realized that the walls going down to the basement were original, I might have considered just drywalling over them or smoothing them out in some other way.

However, I didn't know any of this at the time, and as a result, I can no longer boast that I have entirely original plaster walls. This puts me on a slippery slope with regard to the rest of the house. If I hadn't torn out the walls in the other two locations, I'd feel more strongly about the ceiling in the library. Or, if the kitchen was original, I'd work harder to retain absolutely every original detail, no matter how small.

Further, the ceiling of the library has been covered with spikey plaster and a least a couple layers of paint. This makes it just about impossible to remove the ugly spikey plaster. While the ceiling could probably be repaired by removing but half of the plaster, that would leave me with the dilemma of how to finish the area that I replaced. I hate spikey plaster. Hate hate hate. I hate it more than 1970s faux wood paneling. If I replaced but half of the plaster, I'd be left with a ceiling that would be half smooth and half spikey. I simply cannot bring myself to put textured plaster on the area that I will be repairing.

Finally, it will be really nice to have access to just about all of the plumbing for the second floor bathrooms. A large part of this plumbing is highly suspect - though not because of previous work, but merely because of age. It will be really really nice to have access to all the deteriorating parts and replace those that need to be replaced.

With all this in mind, my stepfather pointed out that the plaster was not in very good condition and that previous repairs had been less than sympathetic. He suggested ripping out the entire ceiling and replacing it with drywall. No two rooms share the same moulding, so it removing it will not remove some similarity between it and the rest of the house. When I am able, I will find some walnut crown moulding and install it. While it may not be a match to the original, it will match the intent and feel of the room.

Of course, I will thouroughly document the original moulding, and retain a section (or sections) of it in good condition, as a record. This seems to me the most reasonable solution.

UPDATE:
It seems that this is a somewhat moot point. I've found, in the course of my demolition, that the ceiling has been replaced at a date that is definitely in the past 40 years. I'm still unsure about the age of the moulding. More to follow.

Thursday, February 12, 2009

Not lazy, efficient

Water damage

We just got the estimate for fixing the ceiling in the library from our general contractor. $300-400. I'm starting to think that I'll do it myself, especially as the amount of work that our roof seems like it will require mounts up - but that's a story for another entry. It's a chunk of money that the house probably needs more in other places.

The challenging part of the repair is the crown moulding, which is plaster. I'd have to cut a straight line near the edge of the crown moulding, cut out the existing plaster and fiberboard, and put in new drywall. Messy but relatively inexpensive. $30 worth of materials - $40 at the most, knowing how I go through mud.

I'm starting to think about a much easier alternative, thus the title of this entry. Perhaps I could just paint over the water stains with Killz and then repaint. What are a few unsightly bulges in the ceiling, anyway? No one (except me) complained when they were smaller.

My real fear, I think, is that I'll tear out the ceiling and be forced to deal with the plumbing for the bathrooms, which sit above the library. While it would be quite handy to have access to them, I fear all the things that might be wrong - and if the ceiling is going to be open, they should be dealt with now.

There is a problem that many of my projects run into while they are in my head, in the planning stage of the game. We plan to be in this house for at least the next 27 years (not that I'm counting down the years until retirement, but I doubt I'll ever find a better place to work, so there's no real reason to move until then), and probably the next 60 years. Thus, I look at things here long term. If I can do something once and do it right, I want to do it that way. I don't want to take the cheap short cut.

It seems, in my head, that every project leads to another project. Fixing the roof requires insulating the attic which requires rewiring the attic... does it never end?