I talked to the plumber today before leaving for work. He explained that he was unable to obtain a straight vertical pipe (I forget the technical term) that goes between the tank and the bowl that is long enough. He said that he'll be fabricating an extension, so that it will sit at the right height.
He further stated that he had attached it to the wall so that he could figure out exactly how high it needed to go. When I pointed out to him that this was one more unnecessary hole in the wall, he said that it would be covered by the tank and that he would caulk it in. I countered that this was an unblemished tile that could have been used for a repair elsewhere in the room, and that this was a hole in the wall that didn't need to be there.
I don't know what to ask for at this point. While there may be manufacturers out there that make white tile that the same shape and has a flat glaze, matching the color will be close to impossible. I don't think it's reasonable to ask him to cover the cost of a custom color match for one tile - that would be excessive.
What would you do? What would you ask for?
Showing posts with label contractors. Show all posts
Showing posts with label contractors. Show all posts
Thursday, March 12, 2009
Monday, November 3, 2008
Waiting, and not for the election
I'm waiting to hear back from the two contractors my real estate agent suggested to us. The only thing stopping us from closing early (actually, just stopping us from closing, early or late) is to get an estimate from a Shaker Heights registered contractor on the work detailed in the city's point of sale inspection. Once we have an estimate, we can work on figuring out how we're going to put together the funds to meet 150% of the estimate, for the city's escrow requirement.
For now, it's just an awful lot of looking at photos of the house and waiting.
For now, it's just an awful lot of looking at photos of the house and waiting.
Labels:
contractors,
inspection,
our house,
Point of Sale,
POS,
waiting
Subscribe to:
Posts (Atom)