Over the holidays, I talked with my father-in-law, an HVAC tech, about my current boiler and possible future options. Our system is hot water, which lends us to greater efficiency potential than is possible with a steam heat system. He had just installed a Burnham Alpine boiler in the church across the street, and had primarily good things to say about the company. As a tech, he appreciates that it is still easy to get parts, quickly, for 35+ year old systems, while some other manufacturers discontinue parts after 10 years.
Although he wasn't able to give specific numbers, he thought, given our usage, that a new boiler would probably pay for itself in 5 or so years. The problem becomes then one of determining how we will pay the $5000-7000 that it will probably cost for the purchase and installation of the system.
The issue that this brings to mind for me, however, is one of venting. The Burnham Alpine uses PVC pipes for ventilation. High efficiency boilers and hot water heaters have special ventilation requirements to meet and as a result of their higher efficiency. They draw air in from outside because it is cleaner, and therefore burns more efficently than, say, sawdust or humidity laden air. They must exhaust outside, rather than into the chimney because their exhaust is cooler, more humid, and more dense, and would lead quickly to the collapse of the chimney in just a few years.
The normal installation would be to just run the vent pipes through the wall of the house. I find the idea of two bright white PVC pipes poking through the wall of my house rather unattractive. Yes, they could be painted to match the brick, but I'm still not completely comfortable with that solution.
One alternative that my father-in-law suggested was to run the vent pipes up the existing chimney. Our boiler and hot water heater use one chimney, while our fireplaces use another, so this wouldn't be a problem. He thought it wouldn't be too difficult to run things that way - just a matter of dropping two or three lengths of PVC pipe down the chimney. While this would cost more, I think the result is worthwhile.
This all leads me to thinking about the hot water heater and its eventual replacement with a tankless model. Tankless hot water heaters have their own special ventilation requirements, which seem to tend toward stainless steel, but which could probably be fit into the chimney if necessary. If I could settle on one system, it seems that it might be reasonable to drop in the vent pipe for the water heater at the same time as the vent pipe is being installed for the boiler.
Of course, I'd love to hear other ideas, including less ugly ways to conceal vents run through walls.
Showing posts with label future plans. Show all posts
Showing posts with label future plans. Show all posts
Monday, December 29, 2008
Thinking Warm Thoughts
Labels:
basement,
boiler,
chimneys,
future plans,
hot water heater,
hvac,
our house,
plumbing,
venting
Subscribe to:
Posts (Atom)